Alberta Gas Plant Flows

Use autocomplete to enter name of gas processing plant below then click View Chart to see the plants inlet/product flows and fuel gas consumption.




Deprecated: Constant FILTER_SANITIZE_STRING is deprecated in /var/www/albertaog/flows.php on line 41

7g Lator 100/01-21-063-02w6 Ggs Flows

e3m3/month for gas volumes, m3/month for liquid volumes all divided by 30 to give average daily volumes

The 7g Lator 100/01-21-063-02w6 Ggs plant is a GS and processes hydrocarbons from the KARR field.


Deprecated: Constant FILTER_SANITIZE_STRING is deprecated in /var/www/albertaog/flows.php on line 188

7g Lator 100/01-21-063-02w6 Ggs Forecast Flows

e3m3/month for gas volumes, m3/month for liquid volumes all divided by 30 to give average daily volumes

Nearby Processing Plants

NameFacility Type
Karr 10-10-65-2w6GP
Twin Butte Jayar 6-8-62-3 W6GP
Burlington Resthaven 1-36GP
Peyto Kakwa 02-11-60-04 W6 Sweet GasGP
7g Lator 01-21-63-02w6 Gas PlantGP
Encana Resthaven 8-11-60-3w6 GpGP
Encana Resthaven 7-11-60-3w6 GpGP
Cinch Kakwa GgsGS
Encana Resthaven 7-11-60-3w6 GpGP
7g Karr 07-11-064-04w6 CompressorGS
Grande Prairie Gs 02-16-060-01w6GS
Mosaic Lator GgsGS
Mosaic Jayar 6-8-62-3 W6GP
Encana Resthaven 7-11-60-3w6 GpGP
Resthaven Ggs 2-10-60-01w6GS
7g Kakwa 13-08-064-04w6 GsGS
7g Lator 100/01-21-063-02w6 GgsGS
7g Lator 01-21-063-02w6 Hp GgsGS
Temple Simonette 9-6-63-25 GgsGS
13-11 CompressorGS
7g Lator#2 2/1-21-63-2w6 GpGP
Karr 07-11 Gathering System - PadGS
Karr 12-35-63-2w6GS
Cqe Simonette 4-27-61-1w6 GgsGS
Patterson Creek Gas Plt 11-21-66-3w6GP
Kanata Simonette 13-11 Gas PlantGP
7g Karr 07-11-064-04w6 Hp GgsGS
Celtic-Mosaic Ggs 01-09-65-04w6GS
Para 16-08-061-03w6 - GgsGS
Paramount Kakwa 4-22-64-04w5 GgsGS
Ciooc 01-16-065-03w600 GsGS
Karr 07-11-064-04w6 Ggs (para)GS
Leaflet | © OpenStreetMap Contributors

Data is from AER ST13 reports.